PLATFORM BU INTEGRATION
Jifmar was contracted by Orange Marine to perform on board of C/S Pierre de Fermat, ROV cable survey and three cable’s hook-ups in the vicinity of the Murdoch platform.
MOORING LINE INSTALLATION – BREST
Jifmar was contracted by BOUYGUES TP to install the mooring lines of an anti-trespassing floating barrier.