Work performed

The Jif Marlin carried out the task of installing two WINDSEA buoys, which collect wind data thanks to the presence of an onboard Lidar, off the coast of Barfleur, France.

Each buoys weight about 13T and is equipped with two dedicated mooring line made of a 2,5T deadweight & anchor

Installation was performed in 1 days for each buoy, under the supervision of client.

An annex vessel, KROKMOU, chartered by the Client was holding the buoys away from the vessel during the operation. Buoys are made of aluminum, quite sensitive to any contact with the hull of our multicat.

Project Informations

Equipment: JIF MARLIN
Location: Fécamp - FRANCE
Contract Type: BIMCO Time Charte
Date Start & Stop: 08/11/2020 – 10/11/2020
Work Operations: 2 WINDSEA Buoy installation near Fécamp