To reduce scour (water erosion) around a wind turbine monopile, JIFMAR was contracted to install 405 sandbags around the monopile seabed.
Roxane Z, our DP2 multipurpose DP2 vessel was fitted with a hydraulic grab and realized the deployment of the bags in 15 days offshore Ramsgate. Maximum capacity on deck was of 58 bags (200kg each), a total of 7 rotation was needed to realize the full job.