SEALINE INSTALLATION

Work performed

JIFMAR was contracted in order to act as client representative to supervise a sealine installation project in Bangladesh.

The initial role was to supervise, but the procedures & overall preparation were found to be not adequate. We had to review in detail the procedures and change them for a less risky method. Operations went well and the full 1,2km long pipes with its manifold were installed in 45 days.

Operations were conducted with really few equipments & in tough conditions, and successful in the end. A good example of our operational skills & adaptability.

Project Informations

Equipment: N/A
Location: BANGLADESH
Date Start & Stop: 2020
Work Operations: Sealine Installation